Instructions
Walk top-to-bottom before locking counts; skipped rows tend to explode during internal QA rather than improving in the field.
Discipline coverage
- Mechanical / electrical / plumbing (and ancillary trades when in-scope) sheets all included on this revision
- Latest issue dates match across coordinated drawings
- Title blocks show the same identifying strings referenced in exclusions
Schedules
- Door, fixture, equipment, plumbing fixture, and panel narratives exist when bids rely on quantities
- Schedule-driven quantities reconcile to plan call-outs within tolerance you approve
- Demo / phased sets captured before scope freezes
Legends
- Active trade legends include every counted glyph on dominant plans
- No orphan descriptions on heavy-density floors
- Demo vs new symbology explained where mixed
Cross-sheet consistency
- Room identifiers line up among RCP, power, HVAC, sprinkler, ceilings
- Equipment elevations tagged on counted plans share tags with elevations
- RCP vs reflected floor clarified when both drive device placement
Specifications / divisions
- Referenced Divisions 01 / 22 / 23 / 26 / FA read when alternates hinge on them
- OFCI versus CFCI equipment paths identified
- Alternates enumerated only after bid-form rules are satisfied
Electrical sheets
- Power, lighting, and one-line sheets are the revision you are counting
- Panel schedules match the symbols on those sheets
- Site electrical is in the bid only when the sheets show it
Bid form housekeeping
- Alternates, unit prices, apprentice / PLA / tracking clauses captured verbatim
- Allowance wording matches allowances called out graphically
- Tax freight escalation flags align with estimating policy
Across the drawings. Estym8 reads what is printed on the sheets, flags conflicts, and drafts RFIs. You still walk the set before you price the bid.