Know the site before schematic.You still decide.

Request access and you get a confirmation immediately.When a pilot batch opens, you get an invite.No payment until you choose a plan.
Architects and developers still burn schematic hours on sites that cannot work.
The usual answers are a GIS screenshot or “ask the AI if this lot works.”
We refuse both.
SiteM8 reads parcel, plat, and zoning toward a buildable envelope.You still call go or no-go.
Request access once.Confirmation is immediate.An invite follows when a batch opens.

Why SiteM8 exists

Architects and developers still burn schematic hours on sites that cannot work.
Parcel, plat, and zoning stay in three PDFs and a planner’s email.
The usual answers are a GIS screenshot or “ask the AI if this lot works.”
We refuse both.
SiteM8 reads the site documents toward a buildable envelope you can defend.
You still decide.

How SiteM8 works

  1. Drop the site pack

    Upload the parcel map, plat, zoning excerpt, and early site PDFs.SiteM8 classifies each file as a source.
  2. Surface the envelope

    Coverage, setbacks, parking, and easement themes land in a site memo with citations back to the source.
  3. You still decide

    Go, pass, or send to counsel.SiteM8 does not stamp entitlements or invent a variance outcome.
  4. The loop keeps running

    Later surveys update the envelope.No restart from a blank memo.

Inside the workspace

Every project shows status and the next human action. It is a queue, not a feed. Sample only — not a live case.

Corner lot — envelope read

Parcel · plat · zoning

Open the site memo and confirm citations before schematic hours. You still call go or no-go.

Envelope ready

What SiteM8 does

Closed pilot is for architects and developers screening sites.Deeper GIS / parcel-ID ingest stays on the horizon — not in this list.
  • Drop parcel, plat, zoning, and early site PDFs once. SiteM8 classifies each file.
  • Surface buildable-envelope themes — coverage, setbacks, parking, easements — with citations.
  • Flag variance and entitlement themes as questions, not as legal conclusions.
  • Keep the go/no-go memo tied to the source documents, not a chat transcript.
  • Accept an Estym8 plan-intelligence export as a later source. SiteM8 never writes Estym8 counts.
  • Export a site memo for the design principal or owner with the citation trail attached.
  • You still review, confirm, and call go or no-go. The site call stays human.

What SiteM8 does not do

  • SiteM8 is not a replacement for a land-use attorney or planner of record.
  • SiteM8 does not auto-approve entitlements or variances.
  • SiteM8 is not a takeoff or bid-estimate product — that is Estym8.
  • SiteM8 is not municipal plan check — that is ColdEyes.
  • SiteM8 is not A/E pre-issue QA — that is PlanM8.
  • SiteM8 is not an ICT Basis of Design — that is Bodi.
  • SiteM8 is the site-read workflow, not a chatbot SKU.

How to get access

  1. Submit a request

    Use your work email.
  2. Get confirmation

    It arrives as soon as you submit.
  3. Wait for an invite

    When a batch opens, we send a signup link.

SiteM8 is the site-read workflow. It is not a chatbot and it does not own the go/no-go call.

One spine.Multiple products.

The same AI-first plan-reading engine powers distinct products for different buyers — takeoff, municipal review, design QA, ICT/BOD, and feasibility.Each is its own product with AI assist inside the workflow.
  • Estym8Closed betaBrief
    GC / estimator takeoff and estimate from plan sets and bid folders — including ROM/WAG screening and full bid-grade depth on the same spine.
  • BodiDiscoveryBrief
    ICT / low-voltage project brain → Basis of Design — sources and claims for security, AV, cabling, and Wi‑Fi scopes.
  • ColdEyesClosed betaBrief
    Permit package review for jurisdictions.ColdEyes researches each draft finding and notifies staff or applicants.Humans approve, deny, or issue.Staff keep the stamp.
  • PlanM8DiscoveryBrief
    Design agency / A/E firm pre-issue QA — coordination flags, checklist completeness, city-style checks before seal or submit.
  • SiteM8DiscoveryBrief
    Architect / developer early site read — parcel, plat, and zoning toward a buildable envelope.

Full portfolio map: suite docs.

Read the site before schematic

Closed pilot for architects and developers who refuse another schematic on a dead lot.Request access — confirmation first, invite when a batch opens.